Sujets en rapport avec les technologies propres » énergie éolienne
Offshore Wind Stakeholder Engagement Plan for Nova Scotia
September – November 2020
Early stakeholder engagement is an important step in the development of an offshore wind industry in Atlantic Canada. This report reviews and summarizes best practices and lessons learned from offshore wind stakeholder engagement in the US Northeast market.
Faits marquants sur l’énergie marémotrice » caractérisation et modélisation des ressources en énergie marémotrice
Going with the Flow: Advancement of Drifting Platforms for use in Tidal Energy Site Assessment & Environmental Monitoring
April 2015 – August 2017
This research project aimed to apply a simple and low cost philosophy to ocean observation by developing an inexpensive low-profile surface drifter for use in initial assessment of potential tidal energy development opportunities. The project addressed limitations in the existing drifter de
Faits marquants sur l’énergie marémotrice » caractérisation et modélisation des ressources en énergie marémotrice
Numerical Modeling of Tidal Turbine Behaviour under Real Turbulent Tidal Flow Conditions
December 2015 – December 2016
Researchers investigated and numerically quantified the behaviour of a tidal turbine under turbulent unsteady tidal flow, using flow data collected in the lower Bay of Fundy (Digby area).
Faits marquants sur l’énergie marémotrice » caractérisation et modélisation des ressources en énergie marémotrice
Characterizing Tidal Flows and Turbine Power Production in Petit Passage using Oceanographic and CFD Models
September 2015 – March 2016
The goal of this project was to identify potential turbine deployment locations in Petit Passage Nova Scotia, using computational fluid dynamics (CFD) and finite volume coastal ocean models (FVCOM).
Faits marquants sur l’énergie marémotrice » caractérisation et modélisation des ressources en énergie marémotrice
Turbulent Scale and Wake Modeling on a Horizontal Axis Turbine
January – April 2015
This project aimed to accurately simulate turbulent flow over a scaled horizontal axis tidal turbine to resolve turbulence in the near and far field regions.
Faits marquants sur l’énergie marémotrice » caractérisation et modélisation des ressources en énergie marémotrice
Turbulence and Bottom Stress in Minas Passage and Grand Passage
September 2011 – February 2015
This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.
Faits marquants sur l’énergie marémotrice » plancher océanique, sédiments et domaine benthique
Testing of Temporal Monitoring Techniques for Benthic Habitat Impacts of Tidal Energy Developments
September 2011 – November 2014
This project tested and developed monitoring procedures for assessing the impact of the placement of in-stream tidal devices (e.g. turbines, cables and other seafloor hardware) on the seafloor environment.
Faits marquants sur l’énergie marémotrice » plancher océanique, sédiments et domaine benthique
Implications of Tidal Energy Extraction on Sedimentary Processes within Shallow Intertidal Environments
September 2011 – April 2014
This project assessed the implications of tidal energy extraction on sedimentary processes within shallow inter-tidal ecosystems.
Faits marquants sur l’énergie marémotrice » caractérisation et modélisation des ressources en énergie marémotrice
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.
Faits marquants sur l’énergie marémotrice » caractérisation et modélisation des ressources en énergie marémotrice
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.