Research Portal

Displaying 1 – 10 of 23 results

Filters

Tidal Energy » Technology

Participation in the Pathway Program through Development of the Platform and Cabling Solution

February 2020 – September 2021

The Pathway Program - Cable & Platform Development / Sensor Integration

Tidal Energy » Technology

Field Assessment of Multi-beam Imaging Sonar Performance in Surface & Bottom Mount Deployments

March – December 2020

The Pathway Program - Technology Validation: Multibeam (Imaging) Sonars

Tidal Energy » Technology

Improved Analysis of Harbour Porpoise Sounds

May – December 2020

The Pathway Program - Data Automation: Passive Acoustic Monitoring Devices

Tidal Energy » Infrastructure and Best Practices

Valuation Method for Electric Ancillary Services

May – September 2020

The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).

Tidal Energy » Tidal Resource Characterization and Modelling

Turbulence and Bottom Stress in Minas Passage and Grand Passage

September 2011 – February 2015

This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.

Tidal Energy » Marine Life

Investigation of the Vertical Distribution, Movement and Abundance of Fish in the Vicinity of Proposed Tidal Power Energy Conversion Devices

March 2010 – December 2014

This project studied active fish avoidance of a turbine using the Coda Octopus Echoscope II 3-D multi-beam sonar mounted on a bottom platform.

Tidal Energy » Seabed, Sediment, and Benthic

Testing of Temporal Monitoring Techniques for Benthic Habitat Impacts of Tidal Energy Developments

September 2011 – November 2014

This project tested and developed monitoring procedures for assessing the impact of the placement of in-stream tidal devices (e.g. turbines, cables and other seafloor hardware) on the seafloor environment.

Tidal Energy » Seabed, Sediment, and Benthic

Implications of Tidal Energy Extraction on Sedimentary Processes within Shallow Intertidal Environments

September 2011 – April 2014

This project assessed the implications of tidal energy extraction on sedimentary processes within shallow inter-tidal ecosystems.

Tidal Energy » Marine Life

Atlantic Sturgeon Spatial and Temporal Distribution in Minas Passage, Nova Scotia, Canada, a Region of Future Tidal Energy Extraction

January 2010 – January 2014

In the Bay of Fundy, Atlantic sturgeon from endangered and threatened populations in the USA and Canada migrate through Minas Passage to enter and leave Minas Basin.